Danaher Water Tower Project Notice


September 4, 2012

                                                                                

Project Notification

                                                                       

The City of Ludington has awarded a maintenance contract to Utility Service Co. to repaint the interior and exterior of the City’s water tower located at810 E. Danaher Street. The existing paint surfaces are in need of resurfacing to protect against corrosion and extend the life of the water tower. The interior will be sandblasted and coated with an epoxy coating system. The exterior will be power washed and pole sanded so that two coats of “white” polyurethane paint can be applied. 

 

If your property is located close to the water tower site, you may notice some dust and odors in the air from the work. These are not harmful to you; however, you may want to keep your windows closed on your home and vehicle during the day to prevent dust from entering your home or vehicle. Utility Service Co. is fully aware of all regulatory requirements of this type of project.

 

Working hours will be limited to the hours of 7:00 am to 7:00 pm Monday thru Saturday. Generators, air compressors, cable winches and other equipment will be in use during the working hours of this project. The contractor may elect to work some Sundays but will minimize noise activity as much as possible.

 

Throughout the project, one may notice slight water pressure fluctuations from time to time due to this particular water tower being out of service.

 

Project Timeline

 

Construction will begin September 7th, 2012 and will be completed in late October 2012 (weather permitting).

 

Caution:

 

Please use caution when traveling or walking adjacent to the construction zone on E. Danaher andS. Staffon Street. It is important to remember that large construction equipment is dangerous and operators are concentrating on the job at hand. Please do not approach the equipment or construction site and instruct children to stay away. Unauthorized personnel are NOT allowed on the construction site.

 

If you have any questions, concerns, or special needs throughout the project, please contact Kurt Malzahn, Water Treatment Plant Superintendent at 231-843-8830. If you have an emergency regarding this project, please contact one of the contacts listed to the side.

 

We sincerely thank you in advance for your patience throughout this project.

 

 

Water Tower Construction Includes:

•           Sandblasting of Interior Surfaces

 

•           Power Washing and Pole Sanding of Exterior

 

•           Complete Painting of Interior and Exterior

 

•           Miscellaneous Upgrades & Updates

 

 

Water Tower Construction Schedule:

 

•           Start: September 7, 2012

 

•           Finish: Late October 2012

(Weather permitting)

 

Contractor:

Utility Service

535 Courtney Hodges Blvd.

Perry,Georgia  31069

www.utilityservice.com

Customer Service

815-401-9688 ext. 10

 

Kurt Malzahn

City of Ludington WTP Supt.